
Operator's ManualRIDER COOLING SYSTEMModel No. 132.24607CAUTION:Before using this product, readthis manual and follow all SafetyRules and Operati
Step3• Locate BLACK supply tube from powerunit and BLACK supply tube from mistingnozzle assembly.• Remove protective caps from the BLACKsupply tube an
Step 3• Connect power unit's female connector toMaintenance Minder.Step 4• From inside the engine compartment,locate tractor power supply connect
Finalizing System InstallationStep 1• Review the illustration below to familiarizeyourself with the suggested locations ofthe routing clips (G)EACH SI
Step 2• Using a supplied cable tie (J) organize anyexcess length of supply tubes and stowbehind battery (or along fuel tank ifequipped). Secure supply
KNOW YOUR RIDER COOLING SYSTEMRead this owner's manual before operating.Compare the illustration below with your rider cooling system to familiar
HOW TO START YOUR RIDERCOOLING SYSTEM• With the tractor key in "ON" position,toggle power switch on unit to "ON" posi-tion.NOTE: I
CUSTOMER RESPONSIBILITIESVIA1NTENANCE SCHEDULEsill in dates as you complete"egular serviceSh eck for loose fasten ersSlean ExteriorZmpty Water Ta
• Empty water tank completely, replacecap, and run system to evacuate all wa-ter in supply lines.• Store misting nozzle assembly by foldingover dash o
NOTES:]8
NOTES:]9
SAFETYRULES...2HARDWARECONTENTS...3CARTONCONTENTS...4ASSEMBLY...
For expert troubleshooting and home solutions advice:manage homewww,managemyhome,comFor repair- in your home - of all major brand appliances,lawn and
A...iii!iiiiii_jiiiiiii_iiHiiiTi¸ii-¸?Bfii//HSDEREF. QTY. DESCRIPTIONA 2 Hex Bolt, 5/16"-18 x1-1/4"B 2 Flat Washer, 7/8" ODC 4 Cap S
AA.PowerUnitBB.MistingNozzleAssemblyCC.MountingBracketDD.9/16"DrillBitBB\\/
Tools Required½" Socket Wrench w/ExtensionAllen WrenchesPower DrillAdjustable WrenchMounting Power Unit To TractorNOTE: If there is a 2 or 3 bin
Onceallboltshavebeeninstalled,tightenallnutsusingallenwrenchandsocketonbothboltsandnuts,Mounting Misting Nozzle Assembly toTractorThe rider cooling sy
Usingsupplied9/16"drillbit(DD),drillholethroughthedashatthebottomofthemountinglocation.Usecautionnottodamageanythingintheenginecom-partmentwhiled
Step3IMPORTANT:Ifyouhavenotalreadydoneso,youmustdisconnectthenegative(-)termi-nalofthebatterybeforecompletingthenextsteps.• Repeat with the remaining
Connecting Power Unit toMisting Arm AssemblyStep 1• Locate supply lines and power connectorat the power unit (AA) and uncoil to fulllength.Step 2• Whe
Komentáře k této Příručce